in Port of Spain Trinidad and Tobago sales price shop near me near me shop factory supplier Economy Semi-Servo Santairy Pad Machine manufacturer best Cost Custom Cheap wholesaler

  in Port of Spain Trinidad and Tobago  sales   price   shop   near me   near me shop   factory   supplier Economy Semi-Servo Santairy Pad Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

Our main items are Needle Roller bearings, Cylindrical Roller Bearings, Rod stop Bearings, Spherical basic bearings, Observe roller Bearings for Guideway, Roller Bearings, Merge Bearings for forklifts, Water Pump Bearings, SNR Auto Bearings and all types of Spherical Bearings. The new merchandise consist of a series of substantial-tech and large high quality chains and sprockets and gears, such as chains and gearboxes for agricultural machineries, metallurgical chains, escalator stage-chains, high-speed tooth chains, timing chains, self-lubrication chains, among which have variety substantial velocity tooth chain for car branch dynamic box and aerial chains fill in the blanks of chain in China. Support & Good quality controlWe supply comprehensive drawings and provide each time necessary.
EPTT main stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd configurations

EPTT identify: Semi Servo Sanitary Serviette EPTT
Model: EPT-KBD-800

Puoduct Drawing

EPTT main stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd configurations

Primary EPTT
No. Identify EPTTtity
1 Semi servo sanitary napkin major EPTT 1 established
two Japanese Mitsubishi servo motors eleven sets
3 EPTT managing system: entire servo control one established
four Large velocity sawmill crusher one established
five Drum previous one set
6 SAP feeding unit established on floor(servo management) 1 set
7 Wastage recycling gadget 2 sets
8 Raw content auto unwinding, car tension control, vehicle detecting, vehicle splicing and automobile rejecting device (IncXiHu (West Lake) Dis.Hu (West Lake) Dis. bottom tissue/air-laid paper, absorbent paper, prime sheet nonwoven, PE movie and EPTT movie ) 5 sets
nine Touchable EPTT 1 established
11 Audio proof cabin 1 set
12 EPTT world wide web guiEPTT(EPTT) nine sets
13 Dust EPTTion device 1 set
sixteen Sound evidence and dust EPTTion device for major line one established
22 All the air pipes use stainless metal apart from the pipe used in conveyor suction gadget 1 established
twenty five Davit, weigEPTT limit 200kgs two sets
Glue Applicators
26 Glue applicator Usa model EPTTson (optional) five sets
27 Glue applicator EPTT manufacturer PTT (optional) 6 sets
28 The EPTT established EPTT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd configuration glue applicators (select 1 model)
29 Supply time: _a hundred and twenty__daEPTTafter deposit payment and sample confirmation
Optional Configurations
No. Title EPTTtity Price tag (FOB NANEPTTG)
one. EPTT stacker vehicle bagger
(Total computerized EPTT remedy ,can conserve at lEPTT ten-12 EPTT personnel, if choose this ,no require to select stacker )
one set
2. EPTT Stacker
(Semi car EPTT resolution ,can help save 4-six EPTT workers )
one established
three. Vision detection system
(Can reject any polluted product throughout the manufacturing,one hundred% detection )
one set
4. EPTT detector
(Can detect the EPTT pcs inside of of the diapers, part of QC)
one set
5. Aspect include (3 parts) introducing device
(Stop facet leakage)
1 established
6. Air compressor
(Necessary for the generation line ,could be purchased regionally)
1 established
seven. Air shower space
(Wind shower thoroughly clean prior to EPTTr into the workshop)
1 set

EPTT main parameters:

1 Style speed 800pcs/min
2 Functioning velocity 600 pcs/min
three Experienced price ninety eight%(compute primarily based on seven.5 hours, the charge among certified goods and whole manufacturing amount, other than substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd items triggered by glue applicator error)
four Creation performance ge90%( determine primarily based on seven.five several hours, the price in between real generation amount and idea manufacturing quantity)
five Potential 170KW (Not incXiHu (West Lake) Dis.Hu (West Lake) Dis. the glue applicators)
seven EPTT Three phases 4 wires 380V/50Hz (floor wire)
eight Wire three times120mmtwo 1 times50mm2 1 times25mm2
nine Lowest stress six kg/cm2 ge0.6mpa
ten Air compressor 2.eight mthree/min
11 Total weigEPTT About 70 tons
70
twelve EPTT measurement 29 times3 times4.five M (L timesW timesH)
29 times3 times4.5M( times instances)
13 Doing work area 38 times7 times4.five M (L timesW timesH)
38 times7 times4.5M( moments instances)
fourteen EPTT shade Off-white (can be altered by purchase)
15 Solution measurement One particular measurement (according to order)
sixteen Containers 4 times40HQ
17 EPTT: PE go over EPTT in container

EPTT main components model:

No. Identify Manufacturer Origin
1 Servo motor Mitsubishi Japan
2 EPTT internet XiHu (West Lake) Dis.Hu (West Lake) Dis.r EPTT EPTT
three Touchable EPTT Banner United states of america
four PLC controlling system Mitsubishi Japan
five Sensor Banner Usa
6 Safety creation Schneider France
8 Cutter uncooked content D2 United states
nine Equipment (according to use) EPTB/BEM/NSK/SKF EPTT/Germany/Japan/Sweden
10 Timing belt Optibelt or Gates Germany/United states
eleven Lower voltage digital Schneider France
twelve EPT link terminal EPTT Germany
thirteen Temperature controlling method Omron Japan
fourteen High-pace joint EPTC Japan
fifteen Strain regulating valve Airtac EPTT EPTTiwan
16 Pneumatic component Airtac EPTT EPTTiwan
seventeen Solenoid valve Airtac EPTT EPTTiwan
eighteen Humidity separator Airtac EPTT EPTTiwan
19 EPTT fault alarm Mitsubishi Japan
20 Planetary EPTT APEX EPTT EPTTiwan
21 Liner XiHu (West Lake) Dis.Hu (West Lake) Dis. rail Hiwin EPTT EPTTiwan

EPTT StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd Configuration:
EPTT body composition and primary people
Reasonably reliable square steel frame: Panel 25mm thick, undertake specular paint, six surfaces processing, solid cage with sixty * 60mm square metal in module style, the foundation frame with square tube 100mm occasions 100mm, 18mm thick bottom plate, six floor processing also ,widening following EPTT for mend. Spliced type major board by screw, make certain the large effectiveness .
Glue applicators place on the 2nd system, shorten the glue source length
The primary air suction bucket is installed with unfavorable force exhibit the air scoop EPTTn wheel is set up with swift fixture to faXiHu (West Lake) Dis.Hu (West Lake) Dis.tate the removal of the belt the reduce facet of the conveyor belt previously mentioned the content is mounted with help plate to stop the polymer and international issues from slipping and polluting the reduce material (the belt specification is labeled for maintenance)

EPT configuration:
one. Driving system
All servo motors unified controlled by PLC, realize the treasured adjustment of every single driving device
Every servo motor managing issue can be demonstrated and revised via touchable EPTT
Do not want to alter any EPTT portion to alter product’s measurement

EPTT can remotely controlled, alter parameters according to client’s ask for, can alter the dimension of all raw resources
It can delete the variation of mechanical operating in time and guarantee the experienced fee.

EPTT elements and documents:

Title EPTTtity Name EPTTtity
Kit one established fuse ten pcs
Electric powered heater 5 pcs changeover wheel three sets
Chopping blade 2 pcs Timing belt three pcs
Truncation blade one established Conveying belt two pcs
thermocouple two pcs
EPT schematic diagram 1 again EPTT diagram in one
Instruction of major EPTT elements one EPTT structure in PDF 1

Manufacturing facility-established-up ought to meet these demands:
1: With no vibration, cleanse and very clear atmosphere, excellent air flow, no flammable and explosive and corrosive substances around.
two: Flat concrete ground, concrete number ought to be at lEPTT three hundred# ground stage distinction should be within fifteen-25mm, so that EPTT adjustment is more hassle-free.
three: Floor need to have sufficient bearing capability. Concrete floor thickness is no considerably less than 200mm. if EPTT is place on the 2nd ground, concrete flooring(strengthened concrete pouring) average bearing potential is at lEPTT 3.5tons/sm. EPTT is set no much more than on the 2nd ground.

four: To keep at lEPTT 1 meter distance amongst the again aspect of EPTT (incXiHu (West Lake) Dis.Hu (West Lake) Dis. attached tools) and the walls.
5: To prevent the accident because of to the uneven floor.
6: The within temperature in the manufacturing unit is no considerably less than twelve-15 ordmC.

Uncooked supplies store must fulfill these demands:
1: Tray shelves are necessary to set at the base of raw components in scenario of damp and humidity.
2: Clean and very clear atmosphere, sealed and shut, no mosquito, no flammable and explosive and corrosive substances around. To keep regular temp. 15-thirty ordmC inside the shop is ok.

Raw EPTTs:

EPTT Name GEPT
Fluff pulp 685g/ m2
hydrophilic non-woven as best sheet 18g/ m2
Perforated film 18g/ mtwo
Tissue paper 15g/ mtwo
ADL 35 g/ m2
Air laid paper
Absorbent paper
back sheet PE movie 24g/ m2
EPTT movie 32-35g/ mtwo
Central release paper
Wing’s release paper
SAP
very hot soften adhesive- development

EPTT image (for reference)
()

EPTT major parameters: :

1 Design and style speed 1200pcs/min (300M/min)
two Doing work velocity a thousand pcs/min
3 Qualified fee 98%(determine dependent on seven.5 hrs, the fee in between qualified merchandise and complete production amount, except substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd goods induced by glue applicator error)
4 Creation effectiveness ge90%( calculate dependent on 7.five hours, the fee amongst real production amount and concept manufacturing amount)
5 Capability 300KW (Not incXiHu (West Lake) Dis.Hu (West Lake) Dis. the glue applicators)
seven EPTT Three phases 4 wires 380V/50Hz (ground wire)
eight Wire three times120mm2 1 times50mmtwo 1 times25mmtwo
nine Least expensive stress six kg/cm2 ge0.6mpa
10 Air compressor 2.8 mthree/min
11 Whole fat About 70 tons
twelve EPTT measurement 29 times3 times4.five M (L timesW timesH)
13 Working area 38 times7 times4.five M (L timesW timesH)
14 EPTT color Off-white (can be changed by order)
15 Merchandise dimension One measurement (according to order)
sixteen Containers four times40HQ
seventeen EPTT: PE protect EPTT in container

EPTT primary components model

Title Model Origin
1 Servo motor Mitsubishi Japan
two EPTT web XiHu (West Lake) Dis.Hu (West Lake) Dis.r FIFE United states
three Touchable EPTT Banner Usa
4 PLC controlling technique Mitsubishi Japan
five Sensor Banner Usa
6 Security production Schneider France
eight Cutter raw material M7 Usa
9 Equipment (in accordance to utilization) EPTB/BEM/NSK/SKF EPTT/Germany/Japan/Sweden
ten Timing belt Optibelt or Gates Germany/United states of america
11 Lower voltage electronic Schneider France
twelve EPT relationship terminal EPTT Germany
13 Temperature controlling technique Omron Japan
fourteen High-pace joint EPTC Japan
15 Pressure regulating valve Airtac EPTT EPTTiwan
sixteen Pneumatic factor Airtac EPTT EPTTiwan
seventeen Solenoid valve Airtac EPTT EPTTiwan
eighteen Humidity separator Airtac EPTT EPTTiwan
19 EPTT fault alarm Mitsubishi Japan
20 Planetary EPTT APEX EPTT EPTTiwan
21 Liner XiHu (West Lake) Dis.Hu (West Lake) Dis. rail Hiwin EPTT EPTTiwan

EPTT StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd Configuration
EPTT frame composition and main people
Fairly reliable sq. steel frame: Panel 25mm thick, adopt specular paint, 6 surfaces processing, sound cage with 60 * 60mm sq. metal in module layout, the foundation body with sq. tube 100mm occasions 100mm, 18mm thick base plate, 6 surface processing also ,widening after EPTT for mend. Spliced type primary board by screw, make certain the higher efficiency .
Glue applicators set on the 2nd system, shorten the glue provide distance
The main air suction bucket is installed with damaging pressure display the air scoop EPTTn wheel is set up with rapid fixture to faXiHu (West Lake) Dis.Hu (West Lake) Dis.tate the removing of the belt the reduced side of the conveyor belt over the content is set up with assistance plate to prevent the polymer and international matters from falling and polluting the reduce material (the belt specification is labeled for routine maintenance)
The back again doorways of the EPTT has sound evidence foam

EPT configuration:
1. Driving technique
All servo motors unified controlled by PLC, understand the valuable adjustment of every single driving unit
Each and every servo motor running condition can be demonstrated and revised by means of touchable EPTT
Do not want to adjust any EPTT part to adjust product’s measurement
EPTT can remotely managed, alter parameters in accordance to client’s ask for, can modify the measurement of all uncooked materials
It can delete the distinction of mechanical operating in time and ensure the competent rate.

EPTT parts and files:

Name EPTTtity Nam EPTTtity
Package one established fuse ten pcs
Electric powered heater 5 pcs changeover wheel 3 sets
Cutting blade two pcs Timing belt three pcs
Truncation blade 1 established Conveying belt two pcs
thermocouple 2 pcs
EPT schematic diagram one back EPTT diagram in one
Instruction of principal EPTT components 1 EPTT structure in PDF one

Manufacturing facility-established-up should satisfy these demands:
1: Without having vibration, cleanse and obvious setting, very good air flow, no flammable and explosive and corrosive substances around.
two: Flat concrete floor, concrete quantity ought to be at lEPTT three hundred# floor stage big difference ought to be inside 15-25mm, so that EPTT adjustment is far more handy.
3: Floor need to have sufficient bearing capability. Concrete floor thickness is no less than 200mm. if EPTT is place on the 2nd ground, concrete floor(bolstered concrete pouring) regular bearing potential is at lEPTT three.5tons/sm. EPTT is put no more than on the 2nd floor.

four: To hold at lEPTT 1 meter distance in between the back facet of EPTT (incXiHu (West Lake) Dis.Hu (West Lake) Dis. hooked up products) and the partitions.
5: To prevent the accident because of to the uneven ground.
six: The inside of temperature in the manufacturing facility is no less than 12-fifteen ordmC.

Uncooked resources store must meet up with these requires:
1: Tray shelves are required to place at the base of raw materials in circumstance of damp and humidity.
two: Thoroughly clean and very clear setting, sealed and shut, no mosquito, no flammable and explosive and corrosive substances around. To maintain typical temp. 15-thirty ordmC inside the retailer is alright.

Uncooked EPTTs:

EPTT Title GEPT
Fluff pulp 685g/ m2
hydrophilic non-woven as top sheet 18g/ m2
Perforated film 18g/ m2
Tissue paper 15g/ mtwo
ADL 35 g/ m2
Air laid paper
Absorbent paper
back again sheet PE film 24g/ mtwo
EPTT film 32-35g/ mtwo
Central launch paper
Wing’s launch paper
SAP
very hot soften adhesive- development

  in Port of Spain Trinidad and Tobago  sales   price   shop   near me   near me shop   factory   supplier Economy Semi-Servo Santairy Pad Machine manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Port of Spain Trinidad and Tobago  sales   price   shop   near me   near me shop   factory   supplier Economy Semi-Servo Santairy Pad Machine manufacturer   best   Cost   Custom   Cheap   wholesaler